Up
Residential
Retail
Public/Gov't
Medical
Industrial/Office
Industrial
Educ/Religious
Industrial

INDUSTRIAL

Automotive Racing Products
Santa Paula  California

One-Story, 16,000 SF Industrial Tilt-up Building with 2,500 SF Office and 13,500 SF Light Manufacturing, Exterior is Painted and Sandblasted Concrete

Construction & Rigging
Saticoy, California

One-Story Manufacturing building, 2,500 SF

 

Parnelli Jones Auto & Tire
Ventura  California

A 6,000 SF Headquarters facility upgrade and relocation, including Space Planning and Interiors

Blois Construction
Oxnard  California

Two-Story, 9,600 SF Corporate Office Building, 2nd floor, and lease space, 1st floor additional Repair and Maintenance Facility with adjacent Storage Yard.

Siemens Solar / Arco Solar
Camarillo  California

4-Building, 100,000 SF Complex Built on Spec in 1976 by Owner and Now Completely Occupied by Tenant (with ongoing Modifications Since 1977)

UNISYS / S.D.C.
Camarillo  California

200,000 SF Computer Facility with Office, Including Installation of Two 300 KW Generators

Skurka Engineering
Camarillo  California

Two-Story, 69,000 SF Corporate Office and Manufacturing Facility

Harris-Dracon Facility
Camarillo  California

60,000 SF Office, Manufacturing and Warehouse Facility, with 100% Expansion Scheduled for North Side

Southern California Gas Company
Coastal Division Headquarters
Goleta  California

Remodel of various Offices in existing building

Parker-Metal Bellows Corp.
Moorpark  California

114,000 SF Manufacturing and Corporate Office Building

Jado
Camarillo  California

17,000 SF Office and Distribution Center for European-Manufactured Hardware and Plumbing Accessories

Santa Paula Savings & Loan
Santa Paula  California

Three-Story, 60,000 SF Glass Sheathed Building for Savings & Loan Branch and Rental Office

Camino Real Industrial
Oxnard  California

Two-Story, 38,000 SF Shell Building Complex for 2 to 4 Tenants

Springer/Dupont
Ventura  California

Two, 18,560 SF Multi-Tenant Shell Building

Hadley Engineering
Ventura  California

48,212 SF Facility Building as a Shell Building (Owner Moved his L.A. Manufacturing Unit to Ventura in 1988)

The GAP
Ventura  California

Distribution Warehouse & Offices; 135,000 SF Facility in 1980 and 115,000 SF Facility 1990

Hydrex Pest Control
Camarillo  California

8,442 SF Concrete Block and Type V Construction Buildings for Owner

Boskovich Farms  Inc.
Oxnard  California

94,160 SF Remodel and 1,680 SF Addition for Boskovich Farms at the former Oxnard Frozen Foods Facility

Burhoe Construction
Santa Paula  California

32,000 SF Facility for the Corporate Offices and Repair of Heavy Earth Moving Equipment

Viggo-Spectramed
Oxnard  California

10,000 SF Interior Design and Office Remodeling Project

Whittaker Corporation
Corporate Headquarters & Relocation
Simi Valley  California

19,000 SF Corporate Headquarters move from Wilshire Blvd. to Simi Valley. Architectural & Interior Design in addition to Relocation Coordination

 

 

 

Copyright © 2005   ANDERSON - KULWIEC / ARCHITECTS   877-774-6500   Kashka@KulwiecGroup.com