|
Automotive Racing Products
Santa Paula
California
|
One-Story, 16,000
SF Industrial Tilt-up Building with 2,500 SF Office and 13,500 SF Light
Manufacturing, Exterior is Painted and Sandblasted Concrete
|
 |
|
Construction &
Rigging
Saticoy, California
|
One-Story
Manufacturing building, 2,500 SF |
 |
|
|
Parnelli Jones Auto & Tire
Ventura California
|
A 6,000 SF Headquarters facility upgrade and relocation, including Space Planning and Interiors
|
|
|
Blois Construction
Oxnard California
|
Two-Story, 9,600 SF Corporate Office Building, 2nd floor, and lease space, 1st floor additional Repair and Maintenance Facility with adjacent Storage Yard.
|
|
|
Siemens Solar / Arco Solar
Camarillo California
|
4-Building, 100,000 SF Complex Built on Spec in 1976 by Owner and Now Completely Occupied by Tenant (with ongoing Modifications Since 1977) |
|
|
UNISYS / S.D.C.
Camarillo California
|
200,000 SF Computer Facility with Office, Including Installation of Two 300 KW Generators
|
|
|
Skurka Engineering
Camarillo California
|
Two-Story, 69,000 SF Corporate Office and Manufacturing Facility
|
|
|
Harris-Dracon Facility
Camarillo California
|
60,000 SF Office, Manufacturing and Warehouse Facility, with 100% Expansion Scheduled for North Side
|
|
|
Southern California Gas Company
Coastal Division Headquarters
Goleta California
|
Remodel of various Offices in existing building
|
|
|
Parker-Metal Bellows Corp.
Moorpark California
|
114,000 SF Manufacturing and Corporate Office Building
|
|
|
Jado
Camarillo California
|
17,000 SF Office and Distribution Center for European-Manufactured Hardware and Plumbing Accessories
|
|
|
Santa Paula Savings & Loan
Santa Paula California
|
Three-Story, 60,000 SF Glass Sheathed Building for Savings & Loan Branch and Rental Office
|
|
|
Camino Real Industrial
Oxnard California
|
Two-Story, 38,000 SF Shell Building Complex for 2 to 4 Tenants
|
|
|
Springer/Dupont
Ventura California
|
Two, 18,560 SF Multi-Tenant Shell Building
|
|
|
Hadley Engineering
Ventura California
|
48,212 SF Facility Building as a Shell Building (Owner Moved his L.A. Manufacturing Unit to Ventura in 1988)
|
|
|
The GAP
Ventura California
|
Distribution Warehouse & Offices; 135,000 SF Facility in 1980 and 115,000 SF Facility 1990
|
|
|
Hydrex Pest Control
Camarillo California
|
8,442 SF Concrete Block and Type V Construction Buildings for Owner
|
|
|
Boskovich Farms Inc.
Oxnard California
|
94,160 SF Remodel and 1,680 SF Addition for Boskovich Farms at the former Oxnard Frozen Foods Facility
|
|
|
Burhoe Construction
Santa Paula California
|
32,000 SF Facility for the Corporate Offices and Repair of Heavy Earth Moving Equipment
|
|
|
Viggo-Spectramed
Oxnard California
|
10,000 SF Interior Design and Office Remodeling Project
|
|
|
Whittaker Corporation
Corporate Headquarters & Relocation
Simi Valley California
|
19,000 SF Corporate Headquarters move from Wilshire Blvd. to Simi Valley. Architectural & Interior Design in addition to Relocation Coordination
|
|